Collected This page has been added to your collection.
Subscribe to our RSS feeds

Clicking on subscribe will add an RSS feed into your default RSS reader.

Pages you have collected
4
Downloading your document Please provide us with your details before downloading your PDF.
*

* We promise not to pass your details on to anyone for any reason. For more details, please reaad our privacy policy.

Thank you.

Your document should download automatically.
If it doesn’t appear in your download queue, please click here.

Close
Northern Line Extension

The practice is at the heart of the £1billion infrastructure investment project to regenerate Nine Elms, creating 25,000 new jobs and 16,000 new homes.  JMP is developing the above-ground elements of two new stations and their urban context.  These schemes include a significant over-station development at Nine Elms.  The practice is working alongside Halcrow, who are leading a technical team designing the subsurface infrastructure, and design work has been progressed on the layout of the stations and shafts.

Read more >
  • Sector

    Infrastructure, Landscape + Public Realm

  • Location

    London, UK

  • Description

    -

  • Client

    TfL

  • Size

    -

  • Cost

    Confidential

  • Team

    John McAslan + Partners, Architect
    Halcrow, Design + Building Contractor

  • Status

    2012 Onwards

Holborn Station Infrastructure London, UK 2014 Onwards
Camden Town Station Infrastructure London, UK 2014 Onwards
Anand Vihar Transport Hub Infrastructure New Delhi, India 2013 Onwards
Olympic Energy Centres Infrastructure London, UK 2012
Secure Station Infrastructure 2011 Onwards
Delhi Metro Infrastructure New Delhi, India 2010
Kelvin Link Bridge Infrastructure Glasgow, Scotland 2005
Piccadilly Gardens Interchange Infrastructure Manchester, UK 2002 Onwards
Canning Town Station Infrastructure Newham, London 1997
Site Map